Laserfiche WebLink
Project Title Project Description Project Estimated Cost' <br /> Priority <br /> • <br /> SR 527 Public Access Corridor, 112th to SR 527 road widening and sidewalk& pedestrian HI $14,000,000 <br /> 132nd from 19th to 123rd <br /> Forest Park ped. Overpass/underpass Design, engineer, pedestrian access over/under LOW $600,000 <br /> BNRR mainline <br /> Harborfront Central Segment Develop improved public access opportunities LOW $1,500,000 <br /> along right of way and Port of Everett lands <br /> Harborfront Trail Northern Segment Rebuild deteriorated walkway on W. Marine View LOW $750,000 <br /> Dr. adjacent to shoreline. <br /> Harborfront Walkway: Harborview Park to Pile supported public walkway 100 feet away from LOW $8,000,000 <br /> Mukilteo shoreline <br /> 1-5 Bridge Underpass Snohomish river Construct underpass on existing 1-5 freeway LOW $3,000,000 <br /> bridge connecting the city to Smith Island <br /> Interurban Trail Phase II Develop connector trail from 84th St.,terminus of +$!Att-'4t6N $400,000 <br /> phase one, along PUD right of way to Madison <br /> • <br /> Langus Trail Eastern Segment Acquire 17 acre parcel of land and develop trail LOW $400,000 <br /> along top dike <br /> SR 529 to Marysville Public Access Corridor Develop public access improvements that include, LOW $400,000 <br /> bike lanes along shoulder and bridge widening for <br /> pedestrians. <br /> Smith Island Public Access Trail Construct bike lanes and pedestrian pathways as LOW $450,000 <br /> part of future road widening project <br /> Note: 'Cost Estimates based on best available analysis of Project scope <br />