My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2202-97
>
Ordinances
>
Ordinance 2202-97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 10:51:21 AM
Creation date
3/16/2017 10:51:16 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2202-97
Date
2/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Title Project Description Project Estimated Cost* <br /> Priority <br /> • <br /> Southwest Corridor Trail Develop recreational trail system in Southwest LOW $650,000 <br /> Corridor along existing roadways and public open <br /> space lands. <br /> Forest Park to Harborview Park leg Develop low tide public access and or raised year MED $4,000,000 <br /> round access parallel to rail line from Forest Park <br /> to Harborview Park.Phased development <br /> Harborfront Trail Overland Segment • Connector public access system within right of MED $1,200,000 <br /> way and through lower Forest Park <br /> Harborview Park Overpass/ underpass Pedestrian public access crossing over rail lines MED $500,000 <br /> Interurban Trail Phase III Develop connector trail along Commercial Ave. MED $750,000 <br /> and PUD Right of Way <br /> Interurban Trail SR 526 Overpass/underpass Design and construct freeway pedestrian MED $2,000,000 <br /> overpass/underpass on SR 526 <br /> Langus Trail Northern Segment Construction public access lanes along existing MED $120,000 <br /> right of way <br /> • <br /> Pigeon Creek trails Recreational trails from Hannabrook park, MED $650,000 <br /> Johnson Kelly park, to water front <br /> Riverwalk: Lowell to Hwy. 2 Acquire easements across Newland, Eclipse, MED $400,000 <br /> Wicks, and Dunlop Properties and develop trail to <br /> Hwy 2 bike lane. Prefered alignment <br /> Silver Lake Public Access Trail Construct bike lanes along Silver Lake Drive to MED $650,000 <br /> Thornton Sullivan Park and 122th which will <br /> connect to Interurban Trail <br /> Note: *Cost Estimates based on best available analysis of Project scope <br />
The URL can be used to link to this page
Your browser does not support the video tag.