My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2182-96
>
Ordinances
>
Ordinance 2182-96
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 11:26:26 AM
Creation date
3/16/2017 11:26:20 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2182-96
Date
10/23/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sediment ponds and traps, perimeter dikes, sediment barriers, and other <br /> BMPs intended to trap sediment on-site shall be constructed as a first step in grading. <br /> Earthen structures such as dams, dikes, and diversions shall be seeded and mulched <br /> according to the timing indicated in Erosion and Sediment Control Requirement#1. <br /> F. EROSION AND SEDIMENT CONTROL REQUIREMENT#5: <br /> Cut and Fill Slopes <br /> Cut and fill slopes shall be designed and constructed in a manner that will <br /> minimize erosion. In addition, slopes shall be stabilized in accordance with Erosion and <br /> Sediment Control Requirement#1. <br /> G. EROSION AND SEDIMENT CONTROL REQUIREMENT #6: <br /> Controlling Off-Site Erosion <br /> Properties and waterways downstream from development sites shall be <br /> protected from erosion due to increases in the volume, velocity, and peak flow rate of <br /> stormwater runoff from the project site. <br /> H. EROSION AND SEDIMENT CONTROL REQUIREMENT#7: <br /> Stabilization of Temporary Conveyance <br /> All temporary on-site conveyance channels shall be designed, constructed <br /> and stabilized to prevent erosion from the expected velocity of flow from a 2-year, 24 hour <br /> frequency storm for runoff volumes expected during the construction phase. Stabilization <br /> adequate to prevent erosion of outlets, adjacent streambanks, slopes and downstream <br /> reaches shall be provided at the outlets of all conveyance systems. <br /> I. EROSION AND SEDIMENT CONTROL REQUIREMENT#8: <br /> Storm Drain Inlet Protection <br /> All storm drain inlets made operable during construction shall be protected <br /> so that stormwater runoff shall not enter the conveyance system without first being filtered <br /> or otherwise treated to remove sediment. <br /> C STAGN:DM:STORM ORD(LM9/27/96) <br /> I0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.