J. EROSION AND SEDIMENT CONTROL REQUIREMENT #9: <br /> Underground Utility Construction <br /> The construction of underground utility lines shall be subject to the <br /> following criteria: <br /> 1. Every effort shall be made to close utility lines by the end of the day; <br /> 2. Where consistent with safety and space considerations, excavated <br /> material shall be placed on the uphill side of trenches; and <br /> 3. Trench dewatering devices shall discharge into a sediment trap or <br /> sediment pond. <br /> K. EROSION AND SEDIMENT CONTROL REQUIREMENT#10: <br /> Construction Access Routes <br /> Wherever construction vehicle access routes intersect paved roads, <br /> provisions must be made to minimize the transport of sediment (mud) onto the paved road. <br /> If sediment is transported onto a road surface, the roads shall be cleaned thoroughly at the <br /> end of each day. Sediment shall be removed from roads by shoveling or sweeping and be <br /> transported to a controlled sediment disposal area. Street washing shall be allowed only <br /> after sediment is removed in this manner. <br /> L. EROSION AND SEDIMENT CONTROL REQUIREMENT #11: <br /> Removal of Temporary BMPs <br /> All temporary erosion and sediment control BMPs shall be removed within <br /> thirty (30) days after final site stabilization is achieved or after the temporary BMPs are no <br /> longer needed. Trapped sediment shall be removed or stabilized on site. Disturbed soil <br /> areas resulting from removal shall be permanently stabilized. <br /> M. EROSION AND SEDIMENT CONTROL REQUIREMENT #12: <br /> Dewatering Construction Sites <br /> Dewatering devices that don't achieve state water quality standards shall <br /> discharge into a sediment trap or sediment pond. <br /> CSTAGN.DM:STORM ORD(LM9/27/96) <br /> 11 <br />