My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Dykeman Architects 2/16/2017
>
Contracts
>
6 Years Then Destroy
>
2018
>
Dykeman Architects 2/16/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 1:19:47 PM
Creation date
3/16/2017 1:19:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Dykeman Architects
Approval Date
2/16/2017
Council Approval Date
1/25/2017
End Date
8/31/2018
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion Project
Tracking Number
0000512
Total Compensation
$507,290.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Low Voltage/Communication and Fiber Optics reroute to Library addition. <br /> 6. Provide required documents for SEPA review and make application. <br /> 7. Electrical design for temporary facility lighting and power. <br /> Part 8-Additional Services(not included in contract): <br /> 1. Preparing materials for and attending public presentations,meetings or hearings unless specifically defined <br /> in the Basic Services. <br /> 2. Revising drawings previously approved by Owner,Tenents,or Government Authorities. <br /> 3. Preparing documents for Change Directives,Change Order Proposals,or Change Orders and Drawings for <br /> changes not under the control of the Architect or Architect's consultants. <br /> 4. Value Engineering participation and implimentation. <br /> 5. Code Analysis or Life Cycle Cost Analysis if required by the Owner or Governmental Approvals. <br /> 6. Post Construction Services after Substantial Completion of the project and"follow up"services related to <br /> the construction and operation of the building systems after the final completion. <br /> 7. Preparation of detailed"AS Built"record drawings. <br /> 8. Professional Construction Cost Estimating. <br /> Page 14 <br /> (Form Approved by City Attorney's Office November 1,2009) <br />
The URL can be used to link to this page
Your browser does not support the video tag.