My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/08/15 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/08/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 9:25:14 AM
Creation date
3/17/2017 9:24:54 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/15/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> EXHIBIT A-1 RATES <br /> 5-Jul-07 <br /> City of Everett - Riverfront Development Group 2 Projects, <br /> Landfill Gas and Leachate Collection System Design <br /> Additional Staff (Amendment 1) <br /> Labor Rates <br /> 2007 2008 2009 <br /> HDR Labor Direct Rate Billing Rate Direct Rate Billing Rate Direct Rate Billing Rate <br /> Sr. Roadway Engr-Dave Skinner $58.00 $185.60 $60.32 $193.02 $62.73 $200.74 <br /> Principal-in-Charge-Mike Ofenstein $86.70 $251.95 $90.17 $262.03 $93.77 $272.51 <br /> Bridge Project Engineer- Patrick Li $44.50 $142.40 $46.28 $148.10 $48.13 $154.02 <br /> Bridge Design Engineer $31.00 $99.20 $32.24 $103.17 $33.53 $107.29 <br /> Sr. Bridge CADD-Larry Keller $35.30 $112.96 $36.71 $117.48 $38.18 $122.18 <br /> CADD Technician-Tony Huynh $22.00 $70.40 $22.88 $73.22 $23.80 $76.14 <br /> Mike Pimomo $26.00 $83.20 $27.04 $86.53 $28.12 $89.99 <br /> Multiplier 3.20 <br /> HDR Expenses (Not modified) <br /> Subconsultants <br /> (None) <br /> HDR Subconsultant Admin 5.0% <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.