My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/08/15 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/08/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 9:25:14 AM
Creation date
3/17/2017 9:24:54 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/15/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1310BTT'cJTY COT CII.,AGENDA ITBy OVE1 IIEET <br /> PROJECT TITLE: <br /> Amendment No. 1 to Consent COUNCIL BILL# <br /> Professional Services X _Action Originating Department Public Works <br /> Agreement between the City of First Reading Contact Person Tim Marks <br /> Everett and HDR Engineering, Second Reading Phone Number (425) 257-8876 <br /> Inc. for the amount of Third Reading FOR AGENDA OF <br /> $350,000.00. Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Riverfront Development 6/5/07 Agreement Amendment No.1 <br /> executed with HDR <br /> Amount Budgeted $1,620,000.00 <br /> Expenditure Required $350,000.00 Account Number(s): Fund 308 <br /> Budget Remaining - 0 <br /> Additional Required - 0 - <br /> DETAILED SUMMARY STATEMENT: <br /> The City of Everett entered into an agreement with HDR Engineering on June 5,2007 to design landfill gas <br /> and a leachate collection system. HDR was proposed to be a subcontractor to Perteet Engineering on a <br /> separate contract agreement that provides the contract plans for the access bridge into the Simpson Site. <br /> HDR would provide the pre-design, design and construction support for the bridge. There are contract <br /> issues between the two firms that have prevented HDR from signing their sub-consultant agreement with <br /> Perteet for the bridge design. In an effort to eliminate any further delay with the bridge design, City Staff is <br /> recommending that the bridge design be added to the existing Professional Service Agreement with HDR. <br /> Amendment No.1 will give City Staff direct control of the bridge design and will allow the design to proceed <br /> without delay. Amendment No. 1 will increase the existing PSA with HDR by$350,000. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 1 to Professional Services Agreement between the City of <br /> Everett and HDR Engineering, Inc. for the amount of$350,000.00. <br /> 7 <br /> CCA Bridge addition-Amendment No. 1 to HDR PSA <br />
The URL can be used to link to this page
Your browser does not support the video tag.