Proposed Engineering Fees <br /> A detailed breakdown of estimated engineering fees by work task and labor classification is <br /> shown on Exhibit B. These proposed fees are based upon the proposed scope of work and <br /> basic assumptions, and the project schedule, all as outlined in this work plan. The work will <br /> be billed at the firm's current standard Schedule of Charges (2007 attached). <br /> Task 1 Project Management $ 10,128 <br /> Task 2 Information and Data Gathering $ 9,287 <br /> Task 3 Design Criteria Development $ 22,623 <br /> Task 4 Concept Development and Evaluation $ 52,490 <br /> Task 5 Surveying and Mapping $ 11,767 <br /> Task 6 Geotechnical Investigations $ 18,585 <br /> Task 7 Preliminary Design Report $ 58,861 <br /> Task 8 Unanticipated Labor or Expenses $ 18,375 <br /> TOTAL $ 202,116 <br /> Schedule <br /> The general schedule goal is to complete the preliminary design effort by February 2008. <br /> Attached is a project schedule that identifies anticipated work progress and project <br /> milestones. <br /> 3( <br /> City of Everett MURRAY,SMITH& ASSOCIATES,INC. LS 24 Predesign <br /> August 2007 Engineers/Planners 17 <br /> F:1BD\Clients\Everett,WA\Lift Station No-241Pre-Design\Scope of Work Revised 8-6-07.doc <br />