Laserfiche WebLink
City of Everett <br /> c/o Murray Smith and Associates <br /> August 10,2007 <br /> Page 3 <br /> We will complete our services.in accordance with the terms and conditions as defined in our Mutual <br /> Services Agreement dated January 24,2005. A breakdown of our budget estimate is provided below. <br /> Review Existing Geotechnical Reports and Published Data S 500 <br /> Plan the Exploration Program,Obtain Permit,and Utility Locate 700 <br /> Field Explorations(1 to 11/2 days in field) <br /> GeoEngineers Staff and Equipment 1,600 <br /> Drilling Subcontractor and Well Installation 5,900 <br /> Geotechnical Laboratory Testing 800 <br /> Ground Water Measurements(up to 6 readings) 2,200 <br /> Office Engineering 1,600 <br /> Report Preparation(includes submittal of 9 copies of draft and final report) 3.200 <br /> Total Preliminary Design Services $16,500 <br /> DCO:ta <br /> EVER:\0\0661068\00\Fi nals\066106800scp.doc <br /> Disclaimer: Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if provided, and any <br /> attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc.and will serve as the official <br /> document of record. <br /> Copyright©2007 by GeoEngineers,Inc. All rights reserved. <br /> 4 7 <br /> 9 <br /> File No.0661-068-00 GEOENGINEERS4, <br />