My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/08/29 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/08/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 9:54:15 AM
Creation date
3/17/2017 9:53:49 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/29/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Everett Lift Station#24 Replacement,Schematic Design Proposal <br /> July 20,2007 :' <br /> Page 2 of 3 - <br /> AC OUSTICS. IAC <br /> ordinance. If the predicted noise levels exceed the maximum allowable noise <br /> levels,provide specific recommendations for design changes and special noise <br /> mitigation measures and equipment that would achieve the noise goals of the <br /> project. Summarize this information in a preliminary report. <br /> 5. Calculate the expected noise levels inside the facility assuming the preliminary <br /> equipment selections and facility layout. Compare the predicted noise levels with <br /> the maximum noise levels recommended by OSHA and WISHA. If the predicted <br /> noise levels exceed the maximum allowable noise levels, provide specific <br /> recommendations for design changes that would achieve the noise goals of the <br /> project. Summarize this information in a preliminary report. <br /> 6. Revise the acoustical analysis to accommodate changes in the selected equipment <br /> or facility design as the project progresses. Up to 2 different revised analyses are <br /> included as part of this.proposal. A revised report will be prepared with each new <br /> acoustical analysis. <br /> Consulting Fee <br /> The fee for providing these services will be a fixed fee sum of$10,850.00. This fee <br /> includes all time and materials necessary to perform the specified services. The table <br /> below itemizes the consulting fee for each specified scope of work item. Services above <br /> and beyond the specified scope will be considered extra services and will be provided <br /> above and beyond the stated maximum fee, if approved in writing by both parties. <br /> Unless a fixed fee is established prior to starting additional services work, additional <br /> services will be billed on an hourly basis at the rate of$240.00 per hour(including travel <br /> time)plus expenses(at cost). Billings will be prepared monthly and invoices shall be paid <br /> within 30 days of the invoice date. The maximum fee and hourly rate for additional <br /> services is guaranteed for a period of 60 days. <br /> Table 1. Consulting Fee Summary <br /> 1 Ambient Noise Measurements & Analysis $1,250 <br /> 2 Review Equipment Selections& Facility Layout $1,800 <br /> 3 Attend Design Team Meetings(total of 4 @$750/ea.) $3,000 <br /> 4 Exterior Noise Analysis with Report $1,800 <br /> 5 Interior Noise Analysis with Report $1,200 <br /> 6 Revised Noise Analysis with Reports (total of 2 @ $900/ea) $1,800 <br /> 5266 NW Village Park Drive (425)649-9344(voice) 5 6�; <br /> Issaquah,WA 98027 (425)649-0737(fax) <br />
The URL can be used to link to this page
Your browser does not support the video tag.