Laserfiche WebLink
• <br /> . 2 <br /> Sheet 1 of 1 CITY OF EVERETT Contract No. 3300 <br /> Public Works Department <br /> Date: 8/14/07 CHANGE ORDER ESTIMATE Change Order No. 1 <br /> Existing New Unit Unit Estimated Estimated <br /> Item Item Description of Price Quantity Amount of <br /> No. No. Measure Change Change <br /> CONCRETE REMOVAL and <br /> 37 SUBGRADE PREP SY $22.53 3,200 $72,096.00 <br /> CRUSHED SURFACING TOP <br /> 38 COURSE TN $43.00 1,000 $43,000.00 <br /> CEMENT CONCRETE <br /> 39 PAVEMENT 6 IN (3 DAY) SY $66.00 2,500 $165,000.00 <br /> CONCRETE INTEGRAL CURB <br /> 40 W REBAR HOOP TIE LF $13.50 2,100 $28,350.00 <br /> CONCRETE SIDEWALK,4 IN <br /> 41 (2'X 2'TOOLED PATTERN) SY $52.00 850 $44,200.00 <br /> CONCRETE DRIVEWAY 6 IN <br /> 42 SY $66.00 450 $29,700.00 <br /> CONCRETE CURB RAMP W <br /> 43 TRUNCATED DOMES EA $1,000.00 8 $8,000.00 <br /> CONDUIT CROSSINGS on <br /> 44 KROMER LF $57.00 265 $15,105.00 <br /> CRUSHED ROCK for CONDUIT <br /> 45 CROSSINGS, KROMER TN $43.00 195 $8,385.00 <br /> CONCRETE PAVEMENT <br /> 10 PATCH SY $66.00 (1,100.00) ($72,600.00) <br /> CONCRETE SIDEWALK <br /> 29 RESTORATION SY $44.00 1 (300.00) ($13,200.00) <br /> CONCRETE CURB/CURB <br /> 30 GUTTER RESTORATION LF $20.00 (810.00) ($16,200.00) <br /> 31 CURB RAMP EA $800.00 (3.00) ($2,400.00) <br /> Total <br /> Total Net Increase to Work Order 3300-3 $309,436.00 <br /> 9 <br />