Laserfiche WebLink
6 <br /> 12. Constructability Reviews: At each design submittal, provide a summary of any <br /> known issues that could affect the constructability or potential schedule of the <br /> project. <br /> 13.City Review: A meeting will be conducted with the City to review the 60% and <br /> 90% plans and project manuals and discuss comments. Final 100% complete <br /> plans and specifications will incorporate all prior review comments and will be <br /> suitable for public works bidding. Provide a timely written response addressing <br /> review comments. <br /> 14. Stamping: URS shall apply a Washington Professional Engineer's stamp with <br /> signature and date on the final edition of the project manual and each sheet of the <br /> drawings. The survey control plan shall be stamped by a Washington <br /> Professional Land Surveyor's stamp (Perteet). <br /> Deliverables: <br /> 1. The plan set for the project is summarized below to include the following <br /> drawings: <br /> Sewer Capacity Improvements "J": 21 sheets total <br /> Drawing No. Description <br /> General <br /> G-1 Cover and Title Sheet, Vicinity Map, List of <br /> Drawings <br /> G-2 General Notes <br /> G-3 Legend and Abbreviations <br /> Civil <br /> C-1 through C-4 Force.Main Sewer—Hoyt Ave., Plan and Profile <br /> C-5 through C-6 Force Main Sewer- 17th St., Plan and Profile <br /> C-7 19th St Connection, Plan and Profile <br /> C-8 20th St Diversion, Plan and Profile <br /> (The civil drawings will also show designs and notes for stormwater <br /> facilities, erosion and sediment control measures, site restoration, and <br /> utility relocation Assume one sheet per street block. The scale <br /> requirement of 1 inch = 20 feet may need to be relaxed to allow one sheet <br /> per block.) <br /> Details <br /> C-9 through C-10 General Civil Details <br /> C-11 20th St Diversion Details <br /> 1 7 Sewer System Capacity Improvements".I" City WO#UP3270 2 <br /> September 4.2007 Page 9 <br />