Laserfiche WebLink
6 • <br /> • <br /> Deliverables: <br /> 1. Itemized, spreadsheet style, construction cost estimate tabulation in electronic and <br /> paper format at each submittal milestone(30%, 60%, 90%, 100%). <br /> 2. Engineers estimate formatted per the bid schedule at 90% and 100% submittal <br /> milestones_ <br /> 3. CPM construction schedule submitted at predesign, 60%,90%, and 100% <br /> progress. <br /> Task 5 — Permitting Assistance <br /> This task includes efforts in collaboration with the City to secure permits for the <br /> project. <br /> URS Responsibilities: <br /> 1. City Permit Assistance: Review and assist with the City's permit checklist, <br /> applications and attachments for project permits including erosion and <br /> sedimentation control plan. It is assumed that existing figures and drawings will <br /> be adequate and no new figures or drawings will be produced for this activity_ <br /> City Responsibilities: <br /> 1. City will take the lead in processing all City of Everett permits. <br /> 2. City will produce the initial draft of the SEPA checklist. <br /> Deliverables: <br /> 1. Provide estimates of material quantities,areas and other construction elements as <br /> needed for SEPA checklist and application paperwork. <br /> .4 ssunrptions: <br /> 1. It is assumed that this project will only require City of Everett permits and that no <br /> additional environmental permitting is needed_ • <br /> 2. It is assumed that existing figures or drawings, or those drawings produced as part <br /> of the design deliverables, will be adequate for permit applications. <br /> 1 9 Sewer System Capacity Improvements"J" • City WO#UP3270-2 <br /> September 4.2007 Page 13 <br />