My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/09/25 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/09/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 10:36:28 AM
Creation date
3/17/2017 10:35:47 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/25/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> PROJECT DESCRIPTION AND LIMITS: <br /> The survey work will be performed in the following areas: <br /> • Heading north, Hoyt Avenue,between 25th Street and 1ST`Street(7 blocks) <br /> • Heading east, 17`s Street,between Rucker Avenue and Rockefeller.Ave(4 blocks) <br /> • Heading east, 19`h Street,between Rucker Avenue and Colby Ave(2 blocks) <br /> • Heading east, 20th Street,between Rucker Avenue and Colby Ave(2 blocks) <br /> The survey for Phase 2 of this project will survey and map the visible improvements and <br /> underground utilities within the above Street rights-of-way. <br /> This survey work will locate such surface features as; utilities, stripping, street <br /> monuments, and sufficient pavement elevations to create a two-foot contour interval <br /> basemap of the project. We will also locate utility line paint-outs, surface utility <br /> structures and readily accessible utility pipes and combine them with record utility <br /> information in order to map the pipelines in the project area. Perteet Inc_ field crews will <br /> make all measurements and observations from the ground surface our field personnel will <br /> not attempt a confined space entry.Property boundaries will be depicted from the City of <br /> Everett, GIS data. We have provided for the <br /> We will prepare a plannimetric map with a plot scale of 1" = 20' depicting two-foot <br /> contours in AutoCAD format to City of Everett standards. <br /> ASSUMPTIONS: <br /> • URS wilt order design locates (surface markings) of all known underground <br /> conductible utilities and coordinate with City water crews to physically locate and <br /> surface mark all water distribution pipes and water service connections in advance of <br /> field surveys. <br /> • For the planned design survey activities, it will not be necessary to enter private <br /> residences or buildings to survey basements or obtain other information. <br /> • The following will be provided by the City: <br /> • City crews will locate and surface mark all water distribution pipes and water <br /> service connections in advance of field surveys_ <br /> • City will provide confined space entry into manholes if needed for survey, <br /> mapping,or design purposes(measurements and photographs <br /> • City crews will perform supplemental pothole work necessary to define <br /> existing pavement thickness and materials_ <br /> • City will provide monument location index and blank survey field books. <br /> • City will review electronic copy of basemap for compliance with City CAD <br /> standards and provide written comments. <br /> • City will provide confined space entry into manholes if needed for survey <br /> and mapping or design purposes(measurements and photographs). <br /> Page2of4 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.