My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/10/03 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/10/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 8:37:36 AM
Creation date
3/17/2017 11:01:07 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/3/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR QUALIFICATIONS <br />FIBER OPTIC CABLE INSTALLATIONS IN UTILITY PIPELINES <br />CITY OF EVERETT <br />The City of Everett, Washington is seeking consulting assistance to assess the feasibility <br />of installing fiber optic cable in water transmission pipelines and sewer mains. <br />Consultants interested in submitting a Statement of Qualifications (SOQ) must <br />demonstrate current expertise in fiber optic cable installed in utility pipelines, including <br />potable water transmission pipelines and sewer mains. Consultants without such <br />experience will not be considered qualified. <br />Project Information <br />The City of Everett operates and maintains approximately 50 miles of large water <br />transmission pipeline and approximately 50 miles of large sewer mains. The City is <br />interested in exploring the feasibility of designing, installing, operating, and maintaining <br />fiber optic cables in its large network of water and sewer pipelines, in order to enhance <br />communication resources available to the City between its numerous facilities and <br />departments. <br />Qualified consultants interested in submitting SOQ are requested to state their interest in <br />writing (no later than November 1St, 2007) to John McClellan at Everett Public Works, <br />Utilities Department, 3200 Cedar Street, Everett, WA 98201. Please direct questions to <br />the project manager, John McClellan, at (425) 257-8201. <br />SOQ Requirements <br />The SOQ shall be no longer than 25 type -written pages, including project descriptions, <br />resumes, and cover letter. Font sizes shall be 11 -point minimum. Consultants must <br />provide at least 5 relevant project descriptions completed within the last 5 years. <br />Please provide 6 copies of your SOQ package to the receptionist located on the first floor <br />of the Public Works Service Center located at 3200 Cedar Street, Everett, Washington, <br />98201. The deadline for submittals is 3:00 p.m. on December 1St, 2007. <br />The qualifications will be evaluated, and based on the results several firms may be short- <br />listed and asked to provide proposals for this project. The format and requirements for <br />proposals has not been established at this time. <br />is <br />CADocuments and Setdnas\amcmicha\Loca1 Settinaffemporary Internet Fi1es\0LK80\Fiher-in-Pipe-S0Q_Requiremen[s.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.