My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/10/17 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/10/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 11:33:36 AM
Creation date
3/17/2017 11:32:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> PROFESSIONAL SERVICES AGREEMENT <br /> This AGREEMENT is made and entered into on this day , ,2007 by and <br /> between the CITY OF EVERETT, a municipal corporation under the laws of the State <br /> of Washington, hereinafter referred to as the "City," and Thomas/Lane Associates, <br /> whose address is 2600 Harvard Ave. E., Seattle, WA 98102,hereinafter referred to as the <br /> "Contractor." <br /> WHEREAS, the City desires to engage the Contractor to assess the soundness of <br /> projections and estimates that have been made of scheduled air service that can be <br /> attracted to Paine Field and if the projections prove sound, analyze the resulting impacts, <br /> benefits and costs associated with said air service; and <br /> WHEREAS, Contractor's principals have experience in the application of economic <br /> research methods to public policy analysis,the interpretation of quantitative data in terms <br /> of human impacts and the use of neutral quantitative information to work with elected <br /> officials, agency staffs and concerned stakeholders to define problems and identify <br /> strategies around which consensus can be built; and <br /> WHEREAS, Contractor's principals have experience in the fields of transportation, <br /> airports and aviation and expertise in evaluating the impacts and feasibility of scheduled <br /> commercial air service; and <br /> WHEREAS,the Contractor represented, and by entering into this Agreement now <br /> represents,that it is fully qualified to perform the work to be performed hereunder in a <br /> competent and professional manner; <br /> NOW, THEREFORE,the parties herein do mutually agree as follows: <br /> 1. Engagement of Contractor. The City hereby agrees to engage the Contractor, and <br /> the Contractor hereby agrees to have its principals, Cheryl K. Thomas and Dr. Theodore <br /> Lane, supported as necessary by Contractor's associates and/or staff,to perform the <br /> following services in a competent and professional manner: 1) Assess the soundness of <br /> projections and estimates that have been made of scheduled air service that can be <br /> attracted to Paine Field(Phase I); 2) If the Phase I analysis concludes that the projections <br /> are sound and the estimates attainable, conduct a Phase 2 analysis that will consist of <br /> estimating the resulting impacts, benefits, and costs associated with the scheduled <br /> commercial air service that can be attracted to Paine Field. The detailed scope of work is <br /> attached as Exhibit A (hereafter referred to as "Work"): <br /> Without a written directive of an authorized representative of the City, the <br /> Contractor shall not perform any services that are in addition to, or beyond the scope of, <br /> the Work between the City and Contractor. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.