My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/10/17 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/10/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 11:33:36 AM
Creation date
3/17/2017 11:32:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
}y y x <br /> fy • <br /> ORDINANCE NO. <br /> • <br /> AN ORDINANCE creating a special improvement project entitled "Everett <br /> Performing Arts Center Downtown Plaza", Fund 354, Program 036, to <br /> accumulate all costs for the improvement project. <br /> WHEREAS, the City Council has recognized the need to make improvements in the <br /> vicinity and south of the Everett Performing Arts Center; and <br /> WHEREAS, an important component of a vital, livable, and memorable city is well- <br /> planned and programmed open space; and <br /> WHEREAS, a performing arts center downtown plaza implements the original intent <br /> and vision associated with the Everett Performing Arts Center; <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: A special improvement project is hereby established as Fund 354, Program <br /> 036, entitled "Everett Performing Arts Center Downtown Plaza" to accumulate the costs <br /> required to make improvements for the project. <br /> Section 2: Authorization is hereby granted to the Parks and Recreation Director, under <br /> the administration of the Mayor, to assume full responsibility for conducting all tasks <br /> and performing all necessary steps to accomplish the actions authorized by this <br /> Ordinance. <br /> Section 3: The estimated total cost of the design and construction plan development is <br /> $246,132 including costs related to site surveying, plaza design, creation of <br /> construction drawings, preparing the bid package and construction cost estimates, <br /> providing design support during construction and contract administration. <br /> Section 4: The sum of $246,132 is hereby appropriated to Fund 354, Program 036 <br /> "Everett Performing Arts Center Plaza" as follows: <br /> A. Estimated Project Design Costs <br /> Design, Engineering and construction <br /> plan development $196,120 <br /> Survey of site $ 8,990 <br /> Design development contingency 20% $ 41,022 <br /> Total Estimated Design Costs $246,132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.