My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/10/17 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/10/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 11:33:36 AM
Creation date
3/17/2017 11:32:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approved location that is capable of replicating centralized services and data <br /> related to the operation of the RFC System. Prior to the Milestone of <br /> "Completion of Complete System Commissioning," the Contractor shall provide <br /> to the Agencies an updated System Backup and Disaster Recovery/Business <br /> Resumption Plan and otherwise document compliance with the updated Plan for <br /> which the Agencies have issued a NAC. Subject to agreement by the Parties on <br /> a subsequent Change Order, the Contractor shall conduct a demonstration of the <br /> ability to provide RFCS functionality from the DRC. <br /> 13.3 Contractor shall notify the Contract Administrator within four (4) hours of a <br /> power and/or communications failure, catastrophic event, or other disaster. <br /> 13.4 In the event that a power and/or communications failure, catastrophic <br /> event, or other disaster prevents operations at the central clearinghouse facility <br /> and/or disrupts communications to the RFCS, the Contractor shall: <br /> a. Immediately and automatically place the RFCS components in off-line <br /> operation such that fare sales and collection can continue without <br /> interruption; <br /> b. Within twenty-four (24) hours, activate the Disaster Recovery Center <br /> and provide all RFCS on-line and off-line functionality with the exception of <br /> second tier customer service; <br /> c. Within twenty-four (24) hours, provide Contractor-employed staff on- <br /> site to verify correct operation of the Disaster Recovery Center. Within <br /> this period the Contractor shall also assume on-going operation of the <br /> Disaster Recovery Center until such time as the central clearinghouse and <br /> full system operation is restored; and <br /> d. Within thirty (30) days, restore full clearinghouse and system operation. <br /> 3.0 Deliverable Review Times <br /> Section 3.1-27.5 is amended to add the following "Section 3.1-27.5 (Phase 2)." <br /> This Agreement shall not be construed as altering the review time periods for any <br /> other Agency reviews, which shall remain as provided in the Contract unless <br /> otherwise modified in writing. <br /> CCA#3-Attachment A 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.