4.2 Section 3.1-76.3.5, "Equipment," is amended to read as follows: <br /> 76.3.5 Equipment <br /> a. The price for each type of equipment provided through Full System Acceptance shall <br /> be the price specified in Exhibit 9, Section II based on the estimated total quantity for all <br /> Agencies specified in Appendix A for each type of equipment. <br /> b. Payment for equipment provided (delivered, installed and operating) under Phase I <br /> and covered by the Beta Test will be payable upon Beta Test Acceptance. Provided, <br /> however, King County and King County operated Sound Transit equipment provided <br /> (delivered, installed and operating) prior to Beta Test Acceptance but not covered by the <br /> Beta Test shall be payable at the same time as that equipment specified below in Section <br /> 76.3.5(c). <br /> c. For King County Metro ONLY, payment for its equipment purchased (delivered, <br /> installed and operating) after Beta Test Acceptance will be payable upon successful <br /> completion of complete system commissioning for all the Agencies' equipment in <br /> accordance with section 6.11-11.4.5, "System Commissioning". Provided, however, upon <br /> the parties signing of CCA#3 by September 26, 2007, King County Metro (KCM)will pay <br /> $1 M for certain units(to be determined)of Phase 2 On-board equipment quantities, <br /> which payment would not otherwise be due until Contractor achieves the Milestone for <br /> "Completion of Complete System Commissioning." (The Contractor agrees that such <br /> payment will have no effect on warranty for KCM equipment and nothing will be <br /> construed as reducing or limiting the Contractor's obligations under the Contract to <br /> maintain such equipment without additional compensation through Full System <br /> Acceptance and thereafter during the Warranty Period.) <br /> d. For all other Agencies, full payment for their equipment purchased (delivered, installed <br /> and operating) after Beta Test Acceptance will be payable upon Full System Acceptance <br /> ("Full System Acceptance"is defined in 6.11.11(g)). <br /> e. for Washington State Ferries ONLY, payment for one hundred percent(100%) of <br /> its Gate Adaption Kits (GAK) hardware as specified in Exhibit 9, Section III., and <br /> delivered to WSF is payable upon completion of Beta Test Readiness Acceptance. The <br /> GAK hardware includes, but is not limited to, the GAK Fare Processor and Target. <br /> 4.3 Section 76.3.8, "Training" is amended to read as follows: <br /> 76.3.8 Training <br /> a. The training materials (CDRL 29), operations manuals(CDRL 34) and <br /> maintenance manuals (CDRL 35)were incomplete and otherwise deficient for the Beta <br /> Readiness Milestone. In light of these deficiencies, the Parties agree that only $121,000 <br /> (50% of the Contract price of$242,000 specified in Contract Exhibit 9, Section VII, for <br /> training course development) shall be payable upon issuance of a NAC for Beta Test <br /> Acceptance. During Phase 2, at no additional cost to the Agencies, the Contractor shall <br /> provide the required training videos(or other media)and update the operations manuals, <br /> maintenance manuals, and Agency-customized training materials to include: technical <br /> updates; lessons learned during the Beta Test; and additional content that was omitted in <br /> CCA#3-Attachment A 8 <br />