Laserfiche WebLink
6 EXHIBIT A <br /> SCOPE OF WORK <br /> CITY OF EVERETT WATER FILTRATION FACILTY <br /> CONSULTANT SERVICES <br /> Provide third party consultant services for the development and implementation of a new Water <br /> Filtration Facility Operations and Maintenance Manual. The scope of work will include <br /> incorporating reference material from various capital improvement projects and plant <br /> improvements into one comprehensive document. The new Operation and Maintenance manual <br /> will list the procedures required to operate the Water Filtration Plant in both normal and <br /> emergency configurations. <br /> The new Operations and Maintenance Manual will be incorporated into the Water Filter <br /> Facility's existing electronic library as a ready reference for the operation of the City of Everett's <br /> Water Filtration Facility. <br /> Phase 1 of the project will include 100%completion of an overview and functional description <br /> of the Water Filtration Facility as a whole and each process unit of the Water Filtration Facility. <br /> Detailed descriptions of the process units of the Water Filtration Plant processes will be <br /> completed in future phases. <br /> Deliverable: Updated Operation and Maintenance Manual that will be incorporated within the <br /> Water.Filtration Facilities Electronic Library and one hard bound copy. <br /> Task 1—VERIFY REQUIREMENTS AND PLANT PROCESSES AND PROCEDURES. <br /> • <br /> Task will involve reviewing Washington State Department of Health Administrative Code <br /> (WAC 246-290-4.15) for regulatory requirements pertaining to the operation of water filtration , <br /> facilities, Additional plant process information will be gathered from site visits and reference <br /> documentation from past plant construction projects. (Five Percent or$2,750)) <br /> TASK 2—MANUAL OUTLINE DEVELOPMENT&ELECTRONIC LIBRARY <br /> FORMAT CONFORMITY <br /> Task will involve the development of an outline for the electronic operation and maintenance <br /> manual. This will require building a draft outline of the new operation and maintenance manual <br /> within-the water filtration facilities electronic library and verifying conformity with existing <br /> electronic library format and standards. (Ten Percent or$5,500) <br /> TASK 3 -REVIEW AND COMPILE EXISTING INFORMATION <br /> Task will involve the review and compiling of information from existing reference material <br /> related to water filtration facility construction projects and installed equipment. This information <br /> will be collected from reference material currently located at the water filtration facility and from <br /> external sources. (Forty Percent or$22,000) <br /> 21 <br /> C:\Documents and Settings\bjohnston\My Documents\Everett\PSA BC Amendment#1.(2).doc(YJ 7/15/1999) <br />