Laserfiche WebLink
6 <br /> TASK 4 -EDIT AND VERIFY EXISTING MANUAL CONTENT AND CREATE NEW <br /> CONTENT AS NEEDED. <br /> Task will involve evaluating existing reference material with equipment currently installed at the <br /> water filtration facility. Existing reference material will be edited to reflect the water filtration <br /> facilities operational parameters and philosophy. Missing reference material will be obtained via <br /> external sources, edited and incorporated into the new electronic Water Filtration Facility <br /> Operation and Maintenance Manual. (Forty Percent or$22,000) <br /> TASK 5—PROJECT MANAGEMENT <br /> This task will include the ongoing scheduling and coordination of project activities. <br /> Coordination will include regular onsite and offsite meetings with stakeholders. The Project <br /> Manager will coordinate resources and material to minimize impact on City of Everett staff <br /> while providing deliverables within the specified time frame. (Five Percent or$2,750) <br /> 22 <br /> C:\Documents and SettingAbjohnston\My Documents\Everett\PSA BC Amendment#1(2).doc(YJ 7/15/1999) <br />