Laserfiche WebLink
TASK 4 - EDIT AND VERIFY EXISTING MANUAL CONTENT AND CREATE NEW <br />CONTENT AS NEEDED. <br />Task will involve evaluating existing reference material with equipment currently installed at the <br />water filtration facility. Existing reference material will be edited to reflect the water filtration <br />facilities operational parameters and -philosophy. Missing reference material will be obtained via <br />external sources, edited and incorporated into the new electronic Water Filtration Facility <br />Operation and Maintenance Manual. (Forty Percent or $22,000) <br />TASK 5 — PROJECT MANAGEMENT <br />This task will include the ongoing scheduling and coordination of project activities. <br />Coordination will include regular onsite and offsite meetings with stakeholders. The Project <br />Manager will coordinate resources and material to minimize impact on City of Everett staff <br />while providing deliverables within the specified time frame. (Five Percent or $2,750) <br />4- <br />Q\Documents and Settings\pcomish\Local Settings\Tempormy Internet Fi1es\0LK5A\PSA BC Amendment NLdoc (YJ 7/15/1999) <br />