Laserfiche WebLink
9 <br />EXHIBIT A-4 <br />CITY OF EVERETT <br />SEWER SYSTEM( REPLACEMENT "F" SCOPE REVISIONS <br />FORK ORDER AUP 3188 <br />SCOPE OF WORK <br />Scope Revision Description: <br />Engineering services shall be performed as described in Exhibit A-2 of Amendment 2 to the <br />agreement between CHS Engineers. LLC and the City of Everett and as revised herein. <br />The previously authorized budget associated with Amendment 2 had been prepared utilizing 2006 <br />and earlier CHS labor rates. In order to update the budget funds to reflect CHS labor rates that will <br />be in effect the work is actually performed (2007 through 2008) a multiplier of 6% has been applied <br />to the remaining task balances, with the exception of Tasks 3, 4, and 11. <br />Additions to the project budget are shown in Exhibits B-4 and C-4. Revised and additional survey <br />and engineering for the Sewer System Replacement F project are described below: <br />Schedule A: <br />Revisions and modifications to the previous Schedule "A" design scope of work include the <br />following: <br />A. Increase the pipe diameter from 14 -inch to 36 -inch for the replacement combined sewer <br />main located on the CSO site that generally follows the west and south property lines <br />from CSMH 03 to CSMH 06. <br />B. Delete the previous "Flow splitting" manholes CSMH 06 and 07 and design a new <br />manhole (CSMH 06) per City/HDR direction that will accommodate existing flow and <br />future connections to the proposed CSO facility and other mains. <br />C. Design a new gravity storm drain pipe from the proposed CSO facility to an appropriate <br />connection point for conveyance to PS07. Pipe diameter and other design details to be <br />determined. <br />D. Design a 24 -inch diameter pressure pipe from the proposed CSO facility to an existing <br />valved connection point on the Port Gardner -Kimberly Clark Deep water Outfall at <br />Terminal Ave. This pipe crosses the BNSF railroad property at Bond St_ <br />Additions to the previous Schedule "A" design scope of work include the following: <br />A_ Design for a new 30 -inch diameter combined sewer main from the northwest corner of <br />the CSO site to the intersection of Wall, Kromer and Bond streets. This main will be <br />designed for both gravity and pressurized conveyance conditions per City: HDR direction <br />and will be a "dry line" capped at both ends. A majority of the base mapping and survey <br />for this area will be provided by the CityiPerteet. CHS will provide limited <br />supplemental survey mapping as needed for design. <br />B. Design for a new 24 -inch diameter combined sewer main from the CSO facility to Lift <br />Station 42. This main will be designed for both gravity and pressurized conveyance <br />55 <br />