My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/11/21 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/11/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 8:29:21 AM
Creation date
3/20/2017 8:56:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/21/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mi■ <br />EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br />PROJECT TITLE: <br />Supplemental Agreement No. 3 <br />with URS, to provide <br />engineering design and <br />engineering support services <br />during construction for the <br />South End Interceptor Sta 186 — <br />Sewer Protection project. <br />Location <br />BNSF ROW, North of <br />Junction Ave on the east <br />side of I-5. <br />Consent <br />X Action <br />First Reading <br />Second Reading <br />Third Reading <br />Public Hearing <br />Preceding Action <br />Council authorized the <br />signing of Amendment 2 <br />on 4/4/2007. <br />Budget Committee <br />11/14/07 <br />COUNCIL BILL # <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />Attachments <br />Supplemental Agreement <br />No 3 (two copies) signed <br />by consultant, Exhibit A- <br />3 (Scope of Work) & <br />Exhibit B-3 (Project Cost <br />Summary) <br />11 <br />Public Works <br />Souheil Nasr <br />257-7210 <br />11/21/2007 <br />Department(s) Approval <br />Public Works <br />Amount Budgeted <br />$ 1,500,000 <br />Expenditure Required <br />$ 136,000 <br />Account Number(s): UP 3283 <br />Budget Remaining <br />$ 886,093.10 <br />Additional Required <br />$ 0 <br />DETAILED SUMMARY STATEMENT: <br />The original agreement and amendment's 1 & 2 with URS authorized the Consultant to prepare the design <br />and to provide engineering support services during the construction of the South End Interceptor North <br />Segment Sewer Protection Project. This Supplemental Agreement No. 3 to the Professional Services <br />Agreement with URS amends the original scope of work by adding Exhibit A-3 (Scope of Work) and Exhibit <br />B-3, which includes compensation for engineering design and construction support services for the protection <br />of an additional section of the South End Interceptor as requested by the City. <br />Council had previously approved $91,300 for design and construction support services, $2,000 for bid <br />advertisement expenses and $384,606.90 for construction. This Supplemental Agreement No. 3 will increase <br />the total compensation, including all services and expenses, by a total of $136,000. The total authorized <br />expenditure for this account to date is $477,906.90. The new total including this amendment 3 will be <br />$613,906.90 which is below the project budget of $1,500,000. <br />RECOMMENDATION (Exact action requested of Council): <br />Authorize the Mayor to sign Supplemental Agreement No. 3 with URS, to provide engineering services and <br />engineering support services during construction of the South End Interceptor Sta 186 — Sewer Protection project for <br />an additional cost of $136,000. <br />C:\Documents'and Settings\SuClark\Local Settings\Temporary Internet Files\OLK7D\Council Agenda Supplement 3.DOC 9 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.