My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/11/21 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/11/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 8:29:21 AM
Creation date
3/20/2017 8:56:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/21/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />SUPPLEMENTAL AGREEMENT NO. 3 <br />To <br />PROFESSIONAL SERVICES AGREEMENT <br />This agreement entered into this day of November, 2007, by and between the City of <br />Everett, a municipal corporation under the laws of the State of Washington (City) and URS <br />(Contractor). <br />W itneseth: <br />Whereas the City and Contractor entered into an agreement on September 25; 2006, entitled <br />"Professional Services Agreement" (Agreement) between the City of Everett and URS, to provide <br />engineering services for the pre -design of the South End Interceptor — North Segment 36 -in <br />Sewer Line Protection and on November 7, 2006 amended the agreement by Supplemental <br />Agreement No. 1 to provide design services for the South End Interceptor North Segment 36 -in <br />Sewer Line Protection Project and on April 9, 2007 amended the agreement by Supplemental <br />Agreement No. 2 to provide engineering support services during construction for the South End <br />Interceptor North Segment 36 -in Sewer Line Protection Project <br />Whereas the City and Contractor desire to supplement the Agreement for the purpose of <br />providing engineering design and engineering support services for a second segment of the <br />sewer line protection project. <br />Now therefore, the City and Contractor do mutually agree as follows: <br />All provisions in the Agreement shall remain in effect except as expressly modified by this <br />supplement. The changes to the Agreement are described as follows: <br />Amend the previous Exhibit A, Scope of Work, by adding: "Exhibit A-2 Geotechnical and <br />Pipeline Engineering — 36th Street Sewer Protection Phases 2 and 4". <br />Amend the previous Exhibit B, Compensation, by adding "Exhibit B-3" which includes an <br />estimated Project Cost Summary by task for the additional engineering services. <br />Modify Paragraph 3. Time of Beginning and Completion of Performance, by deleting the <br />existing sentence and replacing with the following sentence: <br />"This Agreement shall commence as of the date of execution of this Agreement and <br />shall be completed by June 30, 2008." <br />Modify Paragraph 4. Compensation, subparagraph D, which describes the maximum total <br />compensation, by deleting the existing sentence and replacing with the following sentence: <br />"Total compensation, including all services and expenses, shall not exceed a <br />maximum of Two Hundred Twenty Seven Thousand Dollars ($227,300)." This <br />amounts to an increase of $136,000. <br />1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.