Laserfiche WebLink
Everett CIP 1996 to 2001 / Roadway Improvements <br /> Public Works- roadway improvements (Page 3 of 10) <br /> Project Location Map Funding 1996 1997 1998 1999 2000 2001 Total Cost <br /> location method <br /> Arterial widening and Rucker Ave to Everett $197 <br /> improvements to Friday Ave Other $785 <br /> 41st St 18 total _ $236 $249 $249 $249 _ $982 <br /> Arterial needs study Seaway, Broadway, Everett $250 <br /> 112th etc. Other $0 <br /> 19 total $75 $75 . $33 $33 $33 _ $250 <br /> Paine Field extension SR 526 to Mukilteo Everett $0 <br /> study waterfront Other $1,000 <br /> 20 total _ $333 $333 $333 $1,000 <br /> SR 525 HOV lanes SR 99 to 1-5 Everett $2,000 <br /> and facilities Other $9,000 <br /> 21 total $3,000 $4,600 $833 $833 _ $833 $11,000 <br /> SR 96 HOV lanes Dumas Rd to 1-5 Everett $300 <br /> and facilities Other $2,700 <br /> 22 total $800 $1,900 _ $3,000 <br /> Arterial widening and East Cady to Everett $300 $350 <br /> improvements to Rainier Other $0 <br /> Madison St 23 total $300 _ _ $350 <br /> Arterial widening and SR 525 to 1-5 Everett $2,200 <br /> improvements to Other $13,800 <br /> 112th St 24 total $200 $4,000 $10,000 $500 $500 $500 $16,000 <br /> Arterial widening and 19th Ave to 35th Everett $540 <br /> improvements to Ave Other $1,260 <br /> 100th St 25 total _ $250 $1,450 $1,800 <br /> Arterial widening and Hardison Rd to Everett L $100 <br /> improvements to Holly Dr Other $0 <br /> 4th Ave West 26 total $33 $33 $33 1 $1,800 <br /> EXhtb‘-v I\ <br />