Laserfiche WebLink
Everett CIP 1996 to 2001 / Roadway Improvements <br /> Public Works- roadway improvements (Page 4 of 10) <br /> Project Location Map Funding 1996 1997 1998 1999 2000 2001 Total Cost <br /> location method <br /> Arterial widening and 75th St to 36th St Everett $0 <br /> improvements to Other $0 <br /> Seaway Blvd 27 total $350 $550 $550 $550 $2,000 <br /> Arterial widening and Airport Rd to Everett $200 <br /> improvements to Evergreen Way Other $0 <br /> 100th St SW 28 total $667 _ $667 $667 $5,000 <br /> - <br /> Arterial widening and Beverly Ln to Everett $227 $227 <br /> • improvements to Evergreen Way Other $100 $100 <br /> 75th St 29 total $327 $327 <br /> Arterial widening and Evergreen Way to Everett $100 <br /> improvements to Beverly Blvd Other $0 <br /> 75th St 30 total $33 _ $33 $33 $600 <br /> Collector Arterial Various locations Everett $50 $50 <br /> improvement needs Other $0 <br /> study 31 total $50 $50 <br /> Construct Riverside Vicinity of 1-5 and Everett $4,400 <br /> Industrial Park East Marine View Dr Other $1,000 <br /> access bridge 32 total $400 $5,000 _ $5,400 <br /> Annual Street Various locations Everett $2,360 <br /> resurfacing/overlays within city Other $0 <br /> 33 total $500 _ $500 $500 _ $500 $500 _ $500 $3,000 <br /> Neighborhood mitigation Various locations Everett $53 <br /> with pedestrian and within city Other $0 <br /> signal improvements 34 total $250 $390 <br /> Neighborhood Various locations Everett $600 $2,083 <br /> mitigation projects with within city Other $0 <br /> traffic enhancements 35 total $600 I $2,083 <br /> kv t c I\ <br />