Laserfiche WebLink
Everett CIP 1996 to 2001 / Roadway Improvements <br /> Public Works - roadway improvements (Page 5 of 10) <br /> Project Location Map Funding 1996 1997 1998 1999 2000 2001 Total Cost <br /> Location method <br /> Boeing mitigation; Various locations Everett $200 $200 $200 $133 $133 $133 $1,537 <br /> implement park- within city Other $0 <br /> and-ride lots 36 total $200 $200 $200 $133 $133 $133 $1,537 <br /> Pedestrian improvements; Various locations Everett $300 <br /> construct pathways within city Other $0 <br /> and curb ramps 37 total $50 _ $50 $50 _ $50 $50 $50 $0 <br /> Neighborhood improvements; Various locations Everett $0 <br /> construct various within city Other $0 <br /> public improvements 38 total $60 $60 $60 - $60 $60 $60 $360 <br /> - <br /> Pavement marking projects Various locations Everett $80 $80 $80 $80 $80 $80 $480 <br /> within city Other $0 <br /> 39 total $80 $80 $80 $80 $80 $80 $480 <br /> Everett Ave signal project Various locations Everett $400 $400 <br /> on Everett Ave Other $0 <br /> 40 total $400 _ $400 <br /> •Upgrade signal master Various locations Everett $555 <br /> & interconnect within city Other $0 <br /> 41 total $445 $75 $75 $92 $92 $92 $870 <br /> Interim traffic signal project Various locations Everett $900 <br /> within city Other $0 <br /> 42 total $150 $150 _ $150 $150 $150 $150 _ $900 <br /> New traffic signals Various locations Everett $600 $600 <br /> within city Other $0 <br /> 43 total $600 $600 <br />