My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/02/27 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/02/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2017 8:56:55 AM
Creation date
3/22/2017 8:56:23 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/27/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> 2 <br /> PROJECT TITLE: <br /> Call for Bids for Construction X Consent COUNCIL BILL# <br /> of Sewer System Capacity Action Originating Department PW/Utilities <br /> Improvements "K"—Phase 1 First Reading Contact Person David Voigt <br /> Project Second Reading Phone Number 425-257-8983 <br /> Third Reading FOR AGENDA OF Feb 27, 2008 <br /> Public Hearing <br /> Initialed by: J" <br /> Department Head ' <br /> CAA <br /> i <br /> Council President � !� <br /> Location Preceding Action Attachments Department(s) Approval <br /> South Everett, see Amend No. 1 to PSA for Project Location Map, <br /> attached project location engineering services for Notice for Advertisement <br /> map Murray Smith Assoc. <br /> May 23, 2007 <br /> Amount Budgeted $7,000,000 <br /> Expenditure Required $2,000 Account Number(s): UP 3271-2 <br /> Budget Remaining $6,998,000 <br /> Additional Required 0 <br /> DETAILED SUMMARY STATEMENT: <br /> Sewer System Capacity Improvement "K" - Phase 1 project augments or replaces approximately 6,800 LF <br /> of sanitary sewer interceptors and forcemain pipes in south Everett. These improvements will provide <br /> additional sewage conveyance capacity in the Central Interceptor system as identified by the Final 2006 <br /> Comprehensive Sewer Plan. <br /> The construction work will occur in two separate areas: <br /> On 3rd Ave SE between 108th St SE and Everett Mall Way, and <br /> On 92"d St SE between Dorn Ave. and West Mall Drive. <br /> In August 2006, Murray, Smith & Associates, Inc. was selected to provide professional engineering and <br /> design services and did complete a preliminary design study for this project in early 2007. Construction <br /> of these Phase 1 improvements will occur during 2008 and 2009. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize to Call for Bids for construction of Sewer System Capacity Improvements"K"— Phase 1 Project. <br /> S:\DVoigt\Sewer K_MSA_UP3271'Council and Bdgt Com,Swr K Ph 1_Call for Bids_Cncl Agenda Cover.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.