My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/02/27 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/02/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2017 8:56:55 AM
Creation date
3/22/2017 8:56:23 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/27/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^/) CITY OF EVERETT, WASHINGTON <br /> SPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS FOR <br /> SEWER SYSTEM CAPACITY IMPROVEMENTS "K" — PHASE 1 <br /> W.O. # UP 3271 <br /> NOTICE TO CONTRACTORS <br /> Notice is hereby given that sealed proposals will be received by the City Clerk at the City Clerk's Office, 1'' <br /> Floor Wall Street Building, 2930 Wetmore, Everett, Washington 98201, until 2:00 PM, on April 1, 2008 for the <br /> construction of approximately 3,700 linear feet of sanitary sewer pipe and approximately 3,100 linear feet of <br /> sanitary sewer force main, described more completely in the specifications and contract documents, entitled"City <br /> of Everett, Washington, Specifications for "SEWER SYSTEM CAPACITY IMPROVEMENTS "K" — <br /> PHASE 1, W.O. # UP 3271" and will then and there be opened and publicly read aloud. The engineer's <br /> estimate for this project is $6,500,000. <br /> Plans, specifications, addenda, and plan holders list for this project may be viewed online at <br /> http://www.everettwa.org/bidscontracts/bids.asp. <br /> Plan sets may also be purchased for reproduction costs at Bill's Blueprints, (425) 259-0859, at 2920 Rockefeller <br /> Avenue, Everett, WA 98201. <br /> For technical questions regarding this project, contact Dave Voigt, Project Engineer, City of Everett, at (425) <br /> 257-8983. <br /> All proposals must be made upon the regular forms provided in the Proposal Section of the contract documents <br /> and must be accompanied by a bid bond or certified check in an amount not less than 5%of the bidder's total bid <br /> amount. <br /> The City reserves the right to reject any and all bids and waive any irregularities or informalities. No bidder may <br /> withdraw his bid after the hour set for the opening thereof. The City further reserves the right to make the bid <br /> award as deemed in the best interest of the City. <br /> The right is reserved by the City to postpone the award for a period of forty-five(45) days after bid opening. <br /> The Contractor will be required to comply with all local, State, and Federal laws and regulations pertaining to <br /> equal employment opportunities. <br /> By order of the City Council, Everett, Washington. <br /> Dated at Everett, Washington. <br /> SHARON MARKS, CITY CLERK <br /> 4 <br /> • <br /> SEWER SYSTEM CAPACITY IMPROVEMENTS"IC—PHASE I,UP 3271 <br /> 2006 Spec Notice to Contractors February 2008 <br /> S:\DVoigt'.Sewer K_MSA_UP327I'Council and Bdgt Com.Sewer K-NOTICE TO CONTRACTORS.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.