My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/03/05 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/03/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2017 9:06:58 AM
Creation date
3/22/2017 9:06:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/5/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5—Unanticipated Services <br /> This task will include additional unanticipated labor or expenses not specifically identified in <br /> the scope of work tasks defined above. Such work items will be implemented on a work <br /> order basis and will be undertaken only after written authorization from the City. <br /> Proposed Engineering Fees <br /> The following is a summary of the proposed engineering fee estimate. A detailed breakdown <br /> of estimated engineering fees by work task and labor classification is shown on Exhibit B. <br /> These proposed fees are based upon the proposed scope of work and basic assumptions, and <br /> the project schedule, all as outlined in this scope of work. The estimated reimbursable <br /> expenses for this project, including subconsultant fees, are shown on Exhibit C. The work <br /> will be billed at the firm's current standard Schedule of Charges in effect at the time the <br /> work is performed(2008 Schedule of Charges is attached as Exhibit D). The firm updates <br /> the Schedule of Charges annually on January 1. <br /> TASK FEE ESTIMATE <br /> 1 —Project Management $2,200 <br /> 2—Preliminary Design $12,330 <br /> 3 —Final Design $38,380 <br /> 4—Bidding and Construction Services $14,760 <br /> 5 —Unanticipated Services $5,000 <br /> TOTAL FEE ESTIMATE $72,670 <br /> Estimated Schedule <br /> The following project milestones for MSA's services described in this scope of work are <br /> estimated and are based on the City's desire to have the project constructed in 2008. Any <br /> permitting and review process with other agencies may require additional time, which is not <br /> addressed in the estimated schedule below. <br /> Authorization to Proceed February 28, 2008 <br /> Site Survey March 16, 2008 <br /> Conceptual Site Plan March 29, 2008 <br /> Design Plans and Specifications (60%) April 21, 2008 <br /> Final Design Plans and Specifications (90%) May11, 2008 <br /> Final Design Plans and Specifications (100%) May 30, 2008 <br /> Contractor Procurement July 15, 2008 <br /> Construction August 1 - December 31, 2008 <br /> 22 <br /> City of Everett MURRAY,SMITH&ASSOCIATES, INC. North Creek <br /> February 11,2008 Engineers/Planners Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.