My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/03/05 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/03/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2017 9:06:58 AM
Creation date
3/22/2017 9:06:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/5/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> 3. One camera ready hard copy, three hard copies and one electronic copy <br /> of the technical specifications in Microsoft Word format. <br /> B. Preparation of a bid tabulation that will include an updated engineer's estimate <br /> of quantities, unit prices and construction cost. <br /> Task 3 Deliverables: <br /> • 60% design plans and specifications <br /> • 90% design plans and specifications <br /> • Final design plans and specifications <br /> • Engineers construction cost estimate <br /> Task 4—Bidding and Construction Services <br /> MSA will assist the City during the bidding and construction of the project. The City will be <br /> responsible for contractor procurement, construction inspection and overall construction <br /> management of the project. MSA will assist the City by providing the following services: <br /> 4.1 Bidding Assistance—Provide the City with bid assistance, answer bidder questions, <br /> provide addendum items, and attend pre-bid conference at the site. <br /> 4.2 Pre-Construction Meeting—Attend pre-construction meeting. <br /> 4.3 Construction Assistance—This will include up to four site visits during construction, <br /> response to contractor questions and RFI's, and review shop drawing and equipment <br /> submittals. <br /> 4.4 Start-Up and Testing—Assist the City with start-up and testing of the system. <br /> 4.5 Project Completion —Assist the City with final inspection and development of a <br /> punch list. Prepare record drawings based on contractor mark-ups and information <br /> provided by the City. <br /> Task 4 Deliverables: <br /> • Addendum items <br /> • Responses to RFI's <br /> • Submittals reviews <br /> • Record drawings <br /> City of Everett MURRAY,SMITH&ASSOCIATES, CNC. North Creek <br /> February 11,2008 Engineers/Planners Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.