My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/03/19 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/03/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2017 9:39:09 AM
Creation date
3/22/2017 9:38:36 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/19/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> F. WHEREAS, the drainage of the Swale is sustained by a City owned pump station <br /> ("Lift Station") located on City property (Lot 1 at the north-end of the Swale) and said <br /> Lift Station operation is designed to pump stormwater from the Swale directly to the <br /> POTW; and <br /> G. WHEREAS, the Parties desire that they each manage the stormwater on their <br /> respective properties, that the City to own and operate the Tightline and Lift Station to <br /> convey the stormwater from the properties to the POTW subject to an equitable cost <br /> sharing arrangement for capital, operation and maintenance expenses. <br /> H. WHEREAS, the Parties wish to provide the option for each Party to perform <br /> maintenance on its own facilities and/or for one Party to perform maintenance services on <br /> the other party's facilities subject to cost reimbursement. <br /> I. WHEREAS, the provisions of this Agreement will contribute to economic <br /> development and protection of the environment, public safety, and is in the public <br /> interest. <br /> NOW, THEREFORE, for good and valuable consideration acknowledged and received, <br /> the Parties agree as follows: <br /> AGREEMENT <br /> 1. Maintenance of Stormwater Facilities <br /> 1.1 Property Stormwater Collection and Conveyance <br /> Each Party will be responsible for managing the quality and quantity of water <br /> being conveyed into the existing Swale and future Tightline (collectively, "Conveyance <br /> Facility") and for maintaining all drainage facilities within its property boundaries, <br /> including ditches, pipes, catch basins and other conveyances that drain into the <br /> Conveyance Facility. The boundary demarcation for each Party's stormwater facilities is <br /> the eastern-most property boundary of Lots 3 and 5, or as set by the Management <br /> Committee established under Section 5 of this Agreement("Management Committee"). <br /> Each Party agrees to provide maintenance of its stormwater facilities so as to not <br /> impede or prevent operations and maintenance of the other party's stormwater facilities. <br /> 141 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.