Laserfiche WebLink
BID TABULATION <br />Sewer System Capacity Improvements "K" Phase 1 <br />W.O.# UP 3271 <br />Date 4/1/2008 <br />NEER'S ESTIMATE I Interwest Construction <br />T <br />CE <br />5130.00 <br />$175.00 <br />5350.00 <br />Prepared By: William Barren <br />UNIT <br />TOT/ <br />AMOUNT <br />AMOUNT <br />For., Dave Voigt, Project Engineer <br />AMOUP <br />$127,500.00 <br />ENGI <br />$691,200.00 <br />ITEM <br />160.00 <br />$136,000.00 <br />$150.00 <br />UNI <br />$25.00 <br />0 <br />ITEM DESCRIPTION <br />UNIT <br />QUANTrr <br />PRI <br />5150.00 <br />$7,500.( <br />526.00 <br />$31,200.00 <br />$25.00 <br />S30,000.1 <br />14 <br />Pavement Patch <br />Tons <br />850 <br />S <br />57,000.00 <br />15 <br />Gravel Borrow <br />Tons <br />24000 <br />$11,500.00 <br />5103,500. <br />16 <br />Controlled Density Fill <br />CY <br />50 <br />S <br />$16,000.00 <br />17 <br />Foundation Material <br />Tons <br />1200 <br />550,000.00 <br />550,000. <br />18 <br />Manhole Type 1, 48 -Inch Diamete <br />EA <br />4 <br />S5, <br />556,000.00 <br />19 <br />Manhole Type 1, 54-lnch Diamete <br />EA <br />1 <br />$7, <br />$429.140 <br />20 <br />Manhole Type 2, 72 -Inch Diamete <br />EA <br />9 <br />$13, <br />21 <br />Manhole Type 3, 72 -Inch Diamete <br />EA <br />1 <br />$14 <br />22 <br />Manhole Type 3, 96 -Inch Diamete <br />EA <br />1 <br />$16 <br />23 <br />Drop Manhole Connection <br />LS <br />1 <br />$25 <br />24 <br />Sanitary Sewer Pipe, 8 -Inch, <br />LF <br />338 <br />PVC D3034 SDR35 <br />25 <br />Sanitary Sewer Pipe, 18 -Inch, <br />LF <br />320 <br />PVC F679 PS46 <br />26 <br />Sanitary Sewer Pipe, 30 -Inch, <br />LF <br />1996 <br />NEER'S ESTIMATE I Interwest Construction <br />T <br />CE <br />5130.00 <br />$175.00 <br />5350.00 <br />TOTAL <br />UNIT <br />TOT/ <br />AMOUNT <br />AMOUNT <br />PRICE <br />AMOUP <br />$127,500.00 <br />$28.80 <br />$691,200.00 <br />$200.00 <br />160.00 <br />$136,000.00 <br />$150.00 <br />5127,500.( <br />$25.00 <br />S600,000.00 <br />520.00 <br />5480,000.( <br />129.00 <br />56,450.00 <br />5150.00 <br />$7,500.( <br />526.00 <br />$31,200.00 <br />$25.00 <br />S30,000.1 <br />975.00 <br />$23,900.00 <br />$5,500.00 <br />$22,000.1 <br />000.00 <br />57,000.00 <br />$6,500.00 <br />$6,5001 <br />000.00 <br />$117,000.00 <br />$11,500.00 <br />5103,500. <br />000.00 <br />S14,000.00 <br />$10,500.00 <br />$10,500. <br />,000.00 <br />$16,000.00 <br />520,000.00 <br />$20,000. <br />,000.00 <br />$25,000.00 <br />550,000.00 <br />550,000. <br />543,940.00 <br />$130.00 <br />$43,940. <br />556,000.00 <br />$155.00 <br />$49,600. <br />$698.600.00 <br />5215.00 <br />$429.140 <br />Plats Plus <br />UNIT <br />TOTAL <br />PRICE <br />AMOUNT <br />$5,000.00 <br />$42.00 <br />5150.00 <br />$127,500.00 <br />$28.80 <br />$691,200.00 <br />$200.00 <br />$10,000.00 <br />$36.00 <br />$43,200.00 <br />$3,500.00 <br />$14,000.00 <br />$4,000.00 <br />$4,000.00 <br />$7,200.00 <br />$64,800.00 <br />$7,500.00 <br />$7,500.00 <br />$8,500.00 <br />$8,500.00 <br />$30,000.00 <br />$30,000.00 <br />$124.00 <br />$41,912.00 <br />$135.00 <br />$43,200.00 <br />$179.00 $357.284.0( <br />James W. Fowler Co. <br />UNIT Ti <br />$100.00 <br />$85,000.00 <br />$17.00 <br />$408,000.00 <br />$100.00 <br />$5,000.00 <br />$42.00 <br />$50,400.00 <br />$7,600.00 <br />$30,400.00 <br />$11,400.00 <br />$11,400.00 <br />$11,000.00 <br />$99,000.00 <br />$8,500.00 <br />$8,500.00 <br />$11,600.00 <br />$11,600.00 <br />$45,000.00 <br />$45,000.00 <br />$73.00 <br />$24,674.00 <br />$140.00 <br />$44,800.00 <br />$335.00 <br />S668.660.0C <br />MidMountain Contractors <br />UNIT <br />TOTAL <br />PRICE <br />AMOUNT <br />$125.00 <br />$106,250.00 <br />$18.00 <br />$432,000.00', <br />$225.00 <br />$11,250.00 <br />$20.00 <br />$24,000.00 <br />$7,200.00 <br />$28,800.00 <br />$9,800.00 <br />$9,800.00 <br />511,000.00 <br />599,000.00 <br />$12,000.00 <br />$12,000.00 <br />$22,000.00 <br />$22,000.00 <br />$45,000.OU <br />545,000.00 <br />$125.00 <br />542,250.00 <br />$185.00 <br />559,200.00 <br />$315.00 <br />$628,740.00 <br />1_t <br />