Laserfiche WebLink
BID TABULATION <br />Sewer System Capacity Improvements "K" Phase 1 <br />W.O.# UP 3271 <br />Date 4/1/2008 <br />Prepared By: William Barren <br />For: Dave Voigt, Project Engineer ENGINEER'S ESTIMATE Interwest Construction <br />ITEM UNIT TOTAL UNIT TOT <br /># ITEM DESCRIPTION UNIT QUANTrP PRICE AMOUNT PRICE AMOII <br />$960.00 <br />PVC 1`679 PS46 <br />$170.00 <br />$83,470.00 <br />27 <br />Sanitary Sewer Pipe, 30 -Inch, <br />LF 765 <br />$55,000.00 <br />$25,000.00 <br />PVC F679 PS 115 <br />$20,000.00 <br />$20,000.00 <br />28 <br />Sanitary Sewer Pipe, 24 -Inch, <br />LF 491 <br />$199,500.00 <br />$1,300.00 <br />Ductile Iron <br />$30,000.00 <br />$30,000.00 <br />29 <br />Sanitary Sewer Force Main Pipe, <br />LF 2902 <br />$4,480.00 <br />20 -Inch, Ductile Iron <br />30 <br />3rd Avenue Force Main Connectic <br />LS 1 <br />31 <br />3rd Avenue Force Main Discharge <br />LS 1 <br />32 <br />92nd Street & Dom Avenue <br />LS I <br />Diversion <br />33 <br />Sewage Air Release Valve, 2 -Inch <br />EA 3 <br />34 <br />48 -Inch Steel Casing w/30 -Inch <br />LF 114 <br />PVC F679 Carrier Pipe, Installed <br />by Boring and lacking <br />35 <br />36 -Inch Steel Casing w/20 -Inch <br />LF 212 <br />Ductile Iron Carrier Pipe, Installed <br />by Boring and Jacking <br />36 <br />Temporary Bypass Pumping <br />LS I <br />37 <br />Storm Drainage Replacement <br />LS 1 <br />38 <br />Monument Cases <br />EA 7 <br />$960.00 <br />$734,400.00 <br />$170.00 <br />$83,470.00 <br />$150.00 <br />$435,300.00 <br />$55,000.00 <br />$55,000.00 <br />$25,000.00 <br />525,000.00 <br />$20,000.00 <br />$20,000.00 <br />$9,000.00 <br />$27,000.00 <br />$1,750.00 <br />$199,500.00 <br />$1,300.00 <br />$275,600.001 <br />$30,000.00 <br />$30,000.00 <br />$25,000.00 <br />$25,000.00 <br />$640.00 <br />$4,480.00 <br />$655.00 <br />$501,075.00 <br />$190.00 <br />$93,290.00 <br />$180.00 <br />$522,360.00 <br />$95,000.00 <br />$95,000.00 <br />535,000.00 <br />$35,000.00 <br />$35,000.00 <br />535,000.00 <br />$16,000.00 <br />$48,000.00 <br />$1,500.00 <br />$171,000.00 <br />$1,000.00 <br />$212,000.00 <br />$30,000.00 <br />$30,000.00 <br />$40,000.00 <br />$40,000.00 <br />$1,000.00 <br />$7,000.001 <br />Plats Plus <br />UNIT <br />PRICE <br />$340.00 <br />5260,100.00 <br />5192.00 <br />$94,272.00 <br />$129.00 <br />$374,358.00 <br />$87,400.00 <br />$87,400.00 <br />$45,000.00 <br />$45,000.00 <br />$24,000.00 <br />$24,000.00 <br />$18,400.00 <br />$55,200.00 <br />$1,400.00 <br />$159,600.00 <br />$820.00 <br />$173,840.00 <br />$196,800.00 <br />$196,800.00 <br />$23,000.00 <br />$23,000.00 <br />$400.00 <br />$2,800.00 <br />James W. Fowler Co. MidMountain Contractors <br />UNIT TOTAL UNIT TOT <br />'RICE AMOUNT PRICE AMOU <br />$400.00 <br />$306,000.00 <br />$360.00 <br />$176,760.00 <br />$195.00 <br />$565,890.00 <br />$70,000.00 <br />$70,000.00 <br />$46,000.00 <br />546,000.00 <br />$32,000.00 <br />$32,000.00 <br />$13,000.00 <br />$39,000.00 <br />$1,300.00 <br />$148,200.00 <br />$900.00 <br />$190,800.00 <br />5120,000.00 <br />$120,000.00 <br />$6,000.00 <br />$6,000.00 <br />$850.00 <br />$5,950.00 <br />$525.00 <br />$401,625.00 <br />$185.00 <br />$90,835.00 <br />$145.00 <br />$420,790.00 <br />$135,000.00 <br />$135,000.00 <br />$65,000.00 <br />$65,OWOO <br />$35,000.00 <br />$35,000.00 <br />$13,500.00 <br />$40,500.00 <br />$1,350.00 <br />$153,900.00 <br />$950.00 <br />$201,400.00 <br />$95,000.00 <br />$95,000.00 <br />$45,000.00 <br />$45,000.00 <br />$400.00 <br />$2,800.00 <br />WE <br />