Laserfiche WebLink
4 <br /> EXHIBIT A-1 <br /> SCOPE OF WORK <br /> 1. Section 1: Work to Be Performed for Wiggums Hollow Skatepark <br /> Same as Exhibit A <br /> 2. Section 2: Services&Deliverables <br /> Construction administration services shall be provided for the skatepark which includes sixteen <br /> hours of technical coordination with the CITY and CONTRACTOR and eight construction site <br /> visits. <br /> C <br /> 3 <br />