Laserfiche WebLink
r_ <br />J <br />21. Key Development Permits. The Parties acknowledge and agree that OM has <br />prepared and filed its Key Development Permit applications. The second sentence in Section <br />16.9 is deleted. <br />22. City Work. The following sections only of Section 18.1 are hereby amended: <br />The City and OM anticipate that, in conjunction with the development of the City <br />Property, the City will concurrently undertake certain public works (the "City Work") in <br />order to provide roadways, conduct certain grading and surcharging, wetland restoration, <br />and various public amenities on and around the City Property, aid in collecting and <br />recovering leachate from the Landfill Site and comply with the City's obligations under <br />the Landfill Environmental Indemnification Agreement, Consent Decree, CAP and <br />Restrictive Covenant. The scope of the City Work and the time frames for substantial <br />completion of each task are as follows: <br />(a) The City will use its best efforts to cause BNSF to relocate its track <br />pursuant to the BNSF Agreement so as to allow for construction of a bridge to the <br />Simpson Site or to otherwise provide OM with a crossing to allow access to the <br />Simpson Site across the BNSF tracks. OM acknowledges and agrees that this <br />work has now been completed by the City in compliance with this Agreement. <br />(c) The City will construct a two (2) lane roundabout (including curb, <br />gutter, sidewalk, streetlights and storm drainage improvements) on 41st Street <br />east of the 41st Street/BNSF overcrossing (the "Roundabout") and extend 41st <br />Street to the northwest corner of the Simpson Site (the "41st Street Extension") <br />with a roadway that includes curb, gutter, pedestrian and bicycle way, streetlights <br />and storm drainage improvements. By January 31, 2009, the City will provide a <br />proposed design to OM for the Final Roundabout and 41st Street Extension. If <br />OM accepts the City's proposed design by February 28, 2009, then The City shall <br />use its best efforts to substantially complete the Roundabout and 41" Street <br />Extension by May 30, 2010 but in no event later than July 2010. The City will <br />provide OM with temporary construction access to the Landfill Site and Simpson <br />Site from September 1, 2008 until the Roundabout and 41st Street Extension are <br />completed. <br />(d) The City will construct an extension of the roadway from Pacific <br />Avenue to 36th Street (the "Main Road Extension). The Main Road Extension <br />shall provide for at minimum two (2) paved travel lanes each 14 feet in width (28 <br />feet in total width), together with pedestrian and vehicular improvements at <br />Chestnut and Pacific Avenue as shown and described in Exhibit J attached hereto. <br />The Main Road Extension shall include storm water collection at the road <br />shoulder, treatment and outfall system. Existing and future utilities will align <br />06107-0063/LEGAL14200426.1 <br />