under the Main Road Extension. The City will install a sanitary sewer line for <br />discharge at the 36th Street pump station. Substantial completion of the Main <br />Road Extension shall occur by May 1, 2011. <br />(e) The City shall grade, fill and surcharge all Landfill Site north of <br />41" Street, including demolition of designated utilities and structures and clearing <br />and grubbing. Surcharge shall be conducted in two phases according to the <br />grading and surcharge plans and specifications prepared by OM and submitted to <br />City for inclusion in the City's grading and surcharge contract documents (the <br />"Grading/Surcharge Plans"). The Phase 1 surcharge shall occur in the area <br />generally defined by the Main Road connecting 41St Street and 36th Street. The <br />Phase 2 surcharge shall occur in the remaining areas north of 41St Street on the <br />Landfill Site. Grading for both Phases shall include but are not limited to: <br />removal/replacement of cap and balance soils across site, importing fill as needed <br />for drainage and grade, with the City providing temporary erosion and sediment <br />control plan for both Phase 1 and Phase 2 per City of Everett Standards. <br />Surcharge is estimated to be fifteen (15) feet high and for a 10 month duration <br />from the last placement of surcharge soils on the Phase. Surplus material from <br />Phase 1 meeting the Grading/Surcharge Plans specifications may be used for <br />surcharge of Phase 2. Substantial completion of Phase 1 grading and surcharge <br />shall occur within thirteen (13) months (excluding any time lost due to grading <br />activity weather restrictions imposed by the OM site grading plan) after OM's <br />submittal of the Grading/Surcharge Plans for Phase 1 and the date the final EIS is <br />issued. Substantial completion of Phase 2 grading and surcharge shall occur by <br />the date that is the later of (i) the date that is thirteen (13) months after OM's <br />submittal of the Grading/Surcharge Plan for Phase 2 and (ii) the date that is <br />twenty-six (26) months after the date the final EIS is issued. The City shall be <br />entitled to use the fill received from the Amended KLB License to fulfill its <br />obligations described herein. Any fill material shall be compacted in accordance <br />with the Grading/Surcharge Plans, including any surcharge materials that remain <br />on the Landfill Site following surcharge activities. The upper 18 inches of soil at <br />the finished grade following surcharge shall be of all-weather surface and to a <br />95% compaction standard. The upper 18 inches of soil maybe cement augmented <br />in order to achieve the all-weather and 95% compaction standards. <br />(f) Complete fill and grading of the Mill Site as set forth in the <br />Amended KLB License attached to the Third Amendment to this Agreement <br />("Mill Site Grading"). Grading shall include but not be limited to grading, <br />grubbing and balance of soils across the Mill Site. The City shall provide and <br />implement a temporary erosion and sediment control plan for the Mill Site per <br />City standards. . <br />(g) The City shall provide a sanitary sewer collection system that will <br />accommodate the preferred alternative development identified in the EIS for the <br />Landfill Site (with a 40 foot setback on the eastern boundary) and the Simpson <br />Site. The City sanitary sewer system shall be located along the eastern boundary <br />06107-0063/LEGAL14200426.1 <br />