Laserfiche WebLink
IM <br />EXHIBIT A - 4 <br />SCOPE OF WORK <br />Task 16. Undefined Services <br />As it is difficult to accurately determine the nature of all work required for this project during the <br />construction phase, (e.g., regulatory agencies and permit requirements, extended Construction <br />Contractor's schedule, extended working hours, coordination with WSDOT, Construction <br />Contractor's means and methods etc), a contingency fund of $150,000 is included in the budget. <br />The funds included in the task cannot be utilized with out prior written approval from the city of <br />Everett. <br />MWH Page 8 EVERETT PHASE 6 <br />4117108 EXHIBIT A-4 SCOPE OF WORK <br />