My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2085-95
>
Ordinances
>
Ordinance 2085-95
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:56:54 AM
Creation date
3/23/2017 9:56:49 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2085-95
Date
8/23/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.XA 1 IT IA �� <br /> C F i�J�►L J <br /> DEVELOPMENT CONTRACT <br /> GLENWOOD TERRACE PLAT/PRD #3-80 • <br /> January 14, 1983 <br /> All permits issued for the development of Glenwood Terrace Plat/PRD #3-80 on the <br /> parcel described in Rezone Ordinance No. 769-81 shall be in compliance with the <br /> approved final site plan, landscaping plans, building designs and the condition <br /> reiterated below: <br /> CONDITIONS: <br /> 1. Internal Streets: The internal streets shall be constructed to the following <br /> standards. <br /> A. 53rd St. and 54th St. starting at the intersection at the play lot shall be <br /> one-way with 40 feet of right-of-way and 24 feet of paving with parking <br /> on one side. <br /> B. 53rd and 10th Pl. starting at Glenwood Ave. shall be two-way with 50 <br /> feet of right-of-way and 32 feet of paving with parking on both sides. <br /> C. A-1 curb and gutter will be utilized through the project except the <br /> applicant may use rolled curb in the townhouse clusters on 54th St. <br /> D. 10th Pl. W. and 53rd St. W. is to serve a maximum of 75 units. (Two-way <br /> street) <br /> E. 10th Place right-of-way is to extend to the southerly property line. <br /> 2. Glenwood Improvements: Sidewalk shall be installed along the frontage of <br /> Glenwood Ave. <br /> 3. Water: All systems installed must be built to City standards and must supply <br /> adequate fire flow to the ultimate development of the entire area. <br /> A. Utilities easements shall be provided on tract B and D to service future <br /> development. This easement is for all utilities. <br /> 4. Sewer: All Sewer mains will be constructed to City standards. <br /> A. All utility easements shall have a minimum of 20 feet width; where <br /> approved by Public Works, 15 feet will be accepted. <br /> B. The System Development Fee for the Southwest Sewer Interceptor will <br /> be $339.00 per unit for single-family dwellings; $496.00 per duplex. The <br /> actual cost shall be computed by the Building Dept. per the ordinance in <br /> effect at the time according to the information provided on approved <br /> plans on the date of final plat approval. <br /> C. Sponsor shall participate in the Southwest Everett Sewer L.I.D. <br /> 5. Drainage: All systems and detentions to be designed in conformance with City <br /> Drainage Ordinance (#514-78). <br /> A. A minimum setback from stream bank of 15 feet. <br /> B. Calculations for elevation must be submitted to indicate that units 3A, <br /> 4B, 33F, 34F, 35F, and 36F are out of the 25 year storm flood plain in an <br /> upstream developed condition and the flood plain shown in the present <br /> contoured grading plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.