Laserfiche WebLink
6. Clearing and Grading Plan: A plan showing the extent of grading and the <br /> methods of controlling erosion shall be presented to the Planning and Public <br /> Works Department. Prior to initial submittal of an erosion control plan, the <br /> Sponsor shall meet with a representative of Utilities Division to discuss erosion <br /> control provisions, construction schedules and stream relocation specifications. <br /> 7. Setbacks: All townhouse units shall provide adequate front yard setbacks to <br /> • <br /> provide two uncovered parking spaces, 18 foot minimum is required on units <br /> 17c through 26c. <br /> 8. Hydrology: All plans submitted for stream relocations shall be reviewed and • <br /> approved by Public Works. <br /> A. The stream at the west end of the project must be drained through <br /> approved means. (per Public Works standards) <br /> B. The stream at the east end of the project, when relocated, shall follow <br /> relocation specifications: <br /> (1) New creek channel shall be reseeded or otherwise stabilized prior <br /> to diversion of water into it. <br /> (2) Storm drains and detention pond shall be constructed and <br /> operational prior to initiation of any other clearing or construction <br /> work. <br /> (3) The detention pond shall be utilized as a sedimentation pond during , <br /> construction. After construction is completed, the accumulated <br /> sediment in the pond shall be removed. <br /> (4) The amount of vegetation removed shall be no greater than that <br /> indicated by Subdivision Management's "Preliminary Clearing and <br /> Landscaping Plan" dated 12/1/80. <br /> (5) A hydraulics permits from the Department of Game shall be <br /> requested. <br /> (6) Areas adjacent to existing or relocated creek channels shall be <br /> reseeded immediately following completion of earth work in that <br /> immediate area. <br /> (7) Open channels shall be protected from sediment laden water by <br /> means of straw bales, filter fabric fences, or other appropriate <br /> means along its entire length. <br /> (8) Exposed soils not adjacent to a creek shall be reseeded within 30 <br /> days of the completion of construction. <br /> (9) If the time of the year is not conducive to successful seeding, <br /> ° mulch can be used in place of seed. These areas will then be <br /> seeded during the next growing season. <br /> (10) If possible, construction activity close to the stream on Tract B <br /> adjacent to units 3A and 4B should be limited to the period between <br /> June 1 and September 1. <br /> 9. Recreation: The active recreational area will be developed per the phasing <br /> plan as shown on the final site plan. <br /> 10. Homeowners: A homeowner's association shall be established to handle <br /> maintenance of common areas. The homeowner's document shall be reviewed <br /> by the City Planning Department prior to sale of any units. <br />