• <br /> • <br /> • <br /> improvements unless specifically approved by the City Engineer and/or <br /> City Council in accordance with final approval of the Binding Site Plan. If <br /> approved, the amount of the guarantee may exceed the limits noted in <br /> Section IV D 1 a to offset additional City exposure. <br /> 2. Warranty Requirements for Acceptance of Final Improvements: <br /> At the time of final acceptance of the improvements, the applicant shall provide <br /> to the City a one year warranty guarantee at 10% of the established final cost of <br /> the improvements which must be acceptable to the City attorney. <br /> E. Improvements <br /> 1. Smooth Transition Of Improvements: <br /> All improvements required by this Ordinance shall be extended as necessary to <br /> provide a smooth transition with existing improvements, both laterally across the <br /> street and longitudinally up and down the street, for utilities and vehicular and <br /> pedestrian traffic. <br /> 2. Utility Improvement Plans: <br /> All street and utility improvement plans shall be prepared by a State of <br /> Washington Licensed Civil Engineer. All plans shall be prepared on <br /> reproducible mylar material and presented to the City for approval. <br /> 3. Acceptance of Improvements: <br /> The City Engineer is hereby authorized to accept all improvements and/or <br /> Right-of-Way dedication required in this Ordinance on behalf of the City. <br /> F. Survey <br /> 1. Survey Required for Binding Site Plans: <br /> a. A survey must be conducted by or under the supervision of a Washington <br /> State registered land surveyor. The surveyor shall certify on the Binding <br /> Site Plan that it is a true and correct representation of the lands actually <br /> surveyed and that the survey was done in accordance with City and state <br /> law. <br /> b. In all Binding Site Plans, lot corners must be set before final approval can <br /> be granted. <br /> c. In all Binding Site Plans, perimeter monuments must be set before final <br /> approval can be granted. <br /> d. In all Binding Site Plans, control monuments must be set before final <br /> acceptance of public improvements. Performance guarantees must <br /> include the installation of all control monuments. Control monuments <br /> must be installed per City Design and Construction Standards. <br /> e. In all Binding Site Plans where final approval is to be granted by the <br /> acceptance of a performance guarantee, lot corners and perimeter <br /> monuments must be set. The performance guarantee must include the <br /> resetting of any monument that has been lost during construction of <br /> public improvements. <br /> 20 <br />