McClure and Sons Inc. 3/1/2017 Change Order 1
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 3/1/2017 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:17 PM
Creation date
3/23/2017 1:45:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
3/1/2017
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
UP3583 Puget Sound Outfall No. 6 Reroute
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000178
Total Compensation
$91,109.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 7/25/2016
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION CHANGE ORDER PROPOSAL JUSTIFICATION <br /> PROJECT NAME: P506-Terminal Stormwater Upgrades DATE: 1/17/17 <br /> PROJECT NO.:None CIP NO.: 1-0-011-01 CHANGE ORDER NO.: <br /> COP#: <br /> WRITTEN JUSTIFICATION <br /> 1. Description of Change: <br /> Repair of sinkhole caused by the pipe failure in the original PSO6 system. <br /> 2. What is required by Contract? <br /> Although this is a city project with the Port contributing 50%, the Interlocal Agreement with the <br /> city allows the Port to add additional work by written approval. <br /> 3. How is this change order proposal the solution? <br /> The work is directly related to and adjacent to the current project. <br /> 4. Alternative(s) considered: <br /> Utilizing another contractor through a bidding process. <br /> 5. Reason for entitlement and why it cannot be paid under existing contract: <br /> Additional work due to sinkhole. <br /> 6. Approvals: <br /> The change order needed approval from the Port of Everett Commission, which was received <br /> February 14, 2017. <br /> 7. Time: Increase or decrease working days: <br /> 15 Days <br /> 8. Cost: Establish or verify increase or decrease. <br /> $91,109.01 Storm water work is exempt from WSST. <br /> 11111 <br /> Submitted By: „mg Date: Ce:;.( 1-7 <br /> Approved B �y�� ��%j „s -to Date: a17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.