Laserfiche WebLink
r ' <br /> 2.8 Additional Pretreatment Measures <br /> A. Whenever deemed necessary, the Director may require users to restrict their <br /> discharge during peak flow periods, designate that certain wastewater be <br /> discharged only into specific sewers, relocate and/or consolidate points of <br /> discharge, separate sewage wastestreams from industrial wastestreams, and such <br /> other conditions as may be necessary to protect the POTW and determine the <br /> user's compliance with the requirements of this ordinance. <br /> B. When determined necessary by the Director, each user discharging into the <br /> POTW, shall install and maintain, on his property and at his expense, a suitable <br /> storage and flow-control facility to ensure equalization of flow. The Director may <br /> require the facility to be equipped with alarms and a rate of discharge controller, <br /> the regulation of which shall be determined by the Director. A wastewater <br /> Discharge Authorization(DA) may be issued solely for flow equalization. <br /> 1 <br /> 16 <br />