Laserfiche WebLink
• <br /> Task 4 ' <br /> City of Everett's 2008 Bridge Inspections <br /> ran ech <br /> Tran TacM1 Englnaa�In g.LLC <br /> Task 4 - Report Submittal <br /> Task Items Project Senior Staff Clerical Total <br /> Manager Engineer Engineer <br /> Project Management 4 1 <br /> Inspection Report 80 90 6 <br /> Bridge Maintenance Report 24 80 60 10 <br /> Total Manhours 108 80 150 17 355 <br /> Direct Rates $ 55.50 $ 50.50 $ 31.50 $ 16.00 <br /> Total Direct Salary Cost $5,994 $4,040 $4,725 $272 $15,031 <br /> Profit at 30%of D.S. $4,509 <br /> Overhead at 1.54 times D.S. $23,148 <br /> Total Labor Cost $42,688 <br /> Total $42,688 <br /> Note—The sum of the above Profit and Overhead is equal to a combined multiplier of 2.84 <br /> i <br /> Page 5 <br />