Laserfiche WebLink
Task 5 <br /> City of Everett's 2008 Bridge Inspections <br /> TrenTaCh Englneerng.LLC <br /> Task 5 - Quality Assurance (QA) <br /> Task Items Project Senior Staff Clerical Total <br /> Manager Engineer Engineer <br /> QA Bridge Inspection Reports 24 <br /> QA Bridge Maintenance Report 24 <br /> Total Manhours 24 24 0 0 48 <br /> Direct Rates $ 55.50 $ 50.50 $ 31.50 $ 17.00 <br /> Total Direct Salary Cost $1,332 $1,212 $0 $0 $2,544 <br /> Profit at 30%of D.S. $763 <br /> Overhead at 1.54 times D.S. $3,918 <br /> Total Labor Cost $7,225 <br /> Total $7,225 <br /> Note—The sum of the above Profit and Overhead is equal to a combined multiplier of 2.84 <br /> Page 6 <br />