Laserfiche WebLink
• <br /> Task 6 <br /> ri <br /> City of Everett's 2008 Bridge Inspections <br /> h ran ecti <br /> Tra nTacti Engln aarin g,LLC <br /> Task 6 - Load Rating Services <br /> Project Senior Staff Clerical Total <br /> Task Items Manager Engineer Engineer <br /> QA/QC <br /> Project Management 4 1 <br /> Load Rating Services 38 100 90 7 <br /> Total Manhours 42 100 90 8 240 <br /> Direct Rates $ 55.50 $ 50.50 $ 31.50 $ 16.00 <br /> Total Direct Salary Cost $2,331 $5,050 $2,835 $128 $10,344 <br /> Profit at 30%of D.S. $3,103 <br /> Overhead at 1.54 times D.S. $15,930 <br /> Total Labor Cost $29,377 <br /> Total $29,377 <br /> Note—The sum of the above Profit and Overhead is equal to a combined multiplier of 2.84 <br /> Page 7 <br />