My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 10:16:24 AM
Creation date
3/24/2017 10:15:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A 1 I <br /> Scope of Professional Engineering Services <br /> Electrical and Control System Drawing Verification and Conversion <br /> Everett Water Pollution Control Facility <br /> PROJECT UNDERSTANDING <br /> The goal of the project is to develop standardized CAD drawings for the existing plant electrical and <br /> control systems. The development of these drawings will be consistent with existing City of Everett CAD <br /> and Drafting standards. The standards that we will follow contain the written descriptions of layering, layer <br /> names,set-up requirements, symbols, etc. The Standards also have drawing templates for use on these <br /> types of projects for control system drawing panel elevations, schematics, etc. These new standards also <br /> conform to the format of the Everett Facilities Standards. <br /> The scope of work will also include field verification of the data on the drawings. Tetra Tech will conduct <br /> field verification,to the fullest extent practice, and mark-up the drawings to reflect the field information. <br /> Task 1- Project Management: <br /> 1. Tetra Tech, Inc shall set-up project files and contract information. <br /> 2. Tetra Tech, Inc shall prepare monthly progress invoices. <br /> 3. Tetra Tech,Inc shall prepare and distribute meeting minutes for each meeting with city staff. <br /> 4. Tetra Tech, Inc shall prepare project close out tasks. • <br /> Task 2—WPCF Drawing Verification and CAD Conversion <br /> Based on the discussion above,we see the following as our scope of services to accomplish your project goals: <br /> 1. Prepare documentation for the project Kick-Off meeting. This will include assisting WPCF Plant staff <br /> on gathering and reviewing drawings to prioritize which drawings to field verify and convert to the new <br /> CAD standards. The kick-off meeting will be held at the WPCF and will include Tetra Tech, Inc.'s <br /> project manager, CAD department head and a controls engineer that will be assisting in checking& <br /> expanding on the drawing content. <br /> Based on the lists and discussions we will prepare meeting minutes for review by the attendees for <br /> comment. <br /> 2. Retrieve all existing City CAD files for the drawings to be field verified and converted. We understand <br /> that some of the drawings will be CAD drawn"from scratch" since the CAD files are not available or the <br /> original hand drafted drawings are still on mylar/sepia. It is assumed that, and therefore the budget is <br /> based on, the scope of work that 75 of the drawings will be CAD conversions and 25 will be from hand <br /> drawings. <br /> 3. As the drawings are being verified, converted, and drafted,an engineer will back check the drawings and <br /> add supplemental information that is practicaL This information will include adding the rack/slot/point <br /> number by each PLC I/O point in addition to the program address (i.e X13,Y 30,etc.) This information <br /> will assist WPCF staff in future trouble shooting. <br /> 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.