My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 10:16:24 AM
Creation date
3/24/2017 10:15:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: i 2 <br /> Professional Services Consent COUNCIL BILL# <br /> Agreement with HDR for the X Action Originating Department Public Works <br /> Design and Permitting First Reading Contact Person Souheil Nasr <br /> Services for Water Second Reading Phone Number (425) 257-7210 <br /> Transmission Line No. 2 Third Reading FOR AGENDA OF June 4, 2008 <br /> Replacement— Phase 8B Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Departments) <br /> Approval <br /> Water Transmission Advertise for Consultants Professional Services Legal, PW <br /> Lines Northern Corridor, on 11/21/07,Budget Agreement(two copies) <br /> between S Lake Stevens Committee on 5/28/08. signed by consultant, <br /> Rd and Williams Rd. Exhibit A-1 (Scope of <br /> Work) &Exhibit B-1 <br /> (Estimated Project Cost <br /> Summary) <br /> Amount Budgeted $7,000,000 <br /> Expenditure Required $749,965 Account Number(s): UP 7210 <br /> Budget Remaining $6,248,035 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> The City of Everett capital budget includes complete replacement of its water transmission lines <br /> No. 2 and No. 3. The replacement will occur over several phases. Transmission line No. 2 is a 78- <br /> year old buried pipeline which is reaching the end of its useful life.This project covers phase 8B, <br /> design and permitting. However, the City reserves the right to amend this contract to cover <br /> subsequent phases. The work under this phase (phase 8B) will consist of replacing approximately <br /> 5,400 feet of 48-inch diameter steel pipe. The budgeted amount for the replacement of phase 8B <br /> is $7,000,000. The City went through a Consultant selection process and selected HDR to do the <br /> work. <br /> This request is to authorize the Mayor to sign a Professional Services Agreement with HDR <br /> Engineeting, Inc. to provide design and permitting services for the Water Transmission Line No. 2 <br /> Replacement— Phase 8B in the amount of$749,965. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign a Professional Services Agreement with HDR Engineeting, Inc. to <br /> provide design and permitting services for the Water Transmission Line No. 2 Replacement— <br /> Phase 8B project in the amount of$749,965. 5 9 <br /> C:\Documents and Settings\SuClark\Local Settings\Temporary Internet Files\OLK54\Council Agenda-PSA.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.