My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/06/11 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/06/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 10:26:44 AM
Creation date
3/24/2017 10:26:25 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/11/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> EXHIBIT A-2 - Scope of Work <br /> For Design of <br /> Sewer System Capacity Improvements and Pipeline Replacement "J" <br /> City of Everett Work Order#UP3270 <br /> General Project Description: <br /> URS is currently performing planning, design, and construction support services <br /> for sewer system capacity improvements for the City of Everett(City) under <br /> Work Order#UP 3270. This amendment is for additional planning, design and <br /> construction support services for the replacement of existing combined sanitary <br /> sewer pipelines and manholes located in central Everett, WA and consisting of <br /> approximately 2,890 linear feet of pipelines. This Scope of Work amendment <br /> addresses only the work associated with the pipeline replacement_ Attachments 1 <br /> and 2 contain a Site Location Map and Plan Map, respectively. <br /> The project is located in central Everett in the following locations: <br /> • Approximately 1,460 feet of sewer replacement in the alley between Hoyt <br /> Ave and Rucker Ave, between 43`d St and 40th St(manhole H4 to manhole <br /> Y18). <br /> • Approximately 470 feet of sewer replacement in the alley between Hoyt <br /> Ave and Rucker Ave, between 39th St and 38'h St(manhole S2 to manhole <br /> Z3). <br /> • Approximately 960 feet of sewer replacement on Wetmore Ave between <br /> 40' St and 38th St(manhole S5 to manhole Z10). <br /> It is intended that the sewer replacements will be bid with the sewer capacity <br /> improvements as a single construction contract. <br /> Schedule: <br /> In accordance with direction from the City, the Sewer System Capacity <br /> Improvements and Pipeline Replacement"J"project is planned to be constructed <br /> in 2009. The City desires to initiate advertisement for construction bids for this <br /> project around April 2009. The proposed design, permitting, and construction <br /> schedule which meets the City's timeline requirements is attached(Attachment <br /> 3). <br /> Sewer System Capacity Improvements <br /> and Pipeline Replacement"J" City WO#UP3270-2 <br /> May 22,2008 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.